Crow Elementary

Information and Links:

Address: 1201 Coke Drive      Arlington, TX 76010

STAGE ONE
Phase: Two

Architect: Hahnfeld Hoffer Standford

Construction Manager: W.B. Kibler

Start Construction: Spring 2017
Finish: Winter 2017*



STAGE TWO
Phase: Four

Architect: VLK Architects

Construction Manager: TBD

Start Construction: 2018*
Finish: 2019*
*Dates are projections and subject to change.


Project Fact Sheet | Spanish

Construction Photos

Bid Notice

Project Status: In Construction

Stage one at Crow is currently underway. It includes the construction of the addition and renovations inside the existing building. Construction on the addition is approximately 90 percent finished, and the renovated art room and STEM labs in the existing building are complete.


Project Scope

Bond-funded work at Crow is being done in two stages. The first stage includes a nearly 4,000 square-foot addition to house new strings and music rooms, new office space, a teacher workroom, and an expanded entrance with a security vestibule. The second stage of bond work includes a series of life-cycle and deficiency upgrades.

  • Add two STEM labs (renovation)
  • Add strings classroom (addition)
  • Add secure entry vestibule (addition)
  • Upgrade technology connectivity
  • Improve existing site accessibility
  • Add additional card access controls
  • Repair roof
  • Repair/replace and upgrade heating and A/C, electrical, electrical equipment, interior finishes, plumbing, exterior, landscaping and site lighting
  • Replace K-pod (kindergarten building) heating and A/C, flooring and roof
  • Upgrade security cameras and PA system (to be done by AISD security and technology departments)

This report includes highlights of projects. The list is not comprehensive and is subject to modification.