RFQ issued for architect/engineer services for Bond Program Phase III; proposals due Oct. 29

Proposal Due Date: Oct. 29, 2015 Due Time: 2 p.m.

Arlington Independent School District (“Arlington ISD”, “the District” or “AISD”) will engage several qualified firms to provide professional architecture/engineering services for the 2014 Bond Program Phase III, in accordance with the terms, conditions, and requirements set forth in this Request for Qualifications (link no longer available).

A Pre-proposal Conference will be held at Arlington ISD Administration Building, 1203 W. Pioneer Pkwy Arlington, TX 76013 on October 13, 2015 at 2:00 p.m.. Due to space limitations, please limit attendance to a maximum of two (2) representatives per firm. Attendance to the pre-proposal conference is not mandatory but highly encouraged.

Firms (“respondents”, “proposers”) desiring to participate in this RFQ process shall respond with a sealed Statement of Qualifications (SOQ) and submit in accordance with the instructions contained in this RFQ. Only one SOQ submittal will be accepted per firm, either as a single prime firm or as part of a joint venture. SOQs will NOT be publicly opened. PLEASE NOTE: Late SOQs will NOT be accepted. Read more (link no longer available).

DOWNLOAD RFQ (link no longer available)