Bids for bond work at Dunn Elementary due April 18

Dunn Elementary

April 3, 2017 - The Board of Education of Arlington Independent School District will receive sealed proposals for bond-funded renovations at Dunn Elementary (CSP 17-77) until April 18, 2017.

About the project
The package includes adding a security vestibule, strings room and two STEM labs, along with life-cycle and deficiency upgrades.

Bids
Bids are due Tuesday, April 18, 2017, by 2 p.m., and should be delivered to the AISD Purchasing Office at the Administration Building located at 1203 W. Pioneer Parkway, Arlington, TX 76013. All bids received after this time will not be accepted. Be sure to see the bid documents for full instructions.

Bid documents may be obtained on the AISD purchasing website.

Pre-proposal conference
A pre-proposal conference will be held on Wednesday, April 5, 2017, at 10:00 a.m. at Dunn Elementary: 2201 Woodside Dr., Arlington, TX 76013. Visitors must check in at the Main Office before proceeding. The meeting will conclude with a visit to each campus.

Questions
For questions, please email tcraig1@aisd.net. Please see CSP specifications for dates and information.

Addendum 1    Addendum 2