Information and Links:

Address: 3001 Quail Lane    Arlington, TX 76016



STEM, STRINGS & VESTIBULE
Phase: Two

Architect: Hahnfeld Hoffer Standford

Construction Manager: W.B. Kibler

Start Construction: Summer 2017
Finish: Winter 2017



LIFECYCLE & DEFICIENCY
Phase: Five

Architect: LBL Architects

Construction Manager: Big Sky Construction

Start Construction: Fall 2019*
Finish: Spring 2019*
*Dates are projections and subject to change.


 

Project Status: Substantially Complete

Stage one - renovations to create two STEM labs and a strings room - is complete. The art room was also renovated and a computer lab converted into a regular classroom.

Stage two - with life-cycle and deficiency upgrades - began at the end of the 2018-2019 school year and should wrap up over the winter break. The scope included roof work, putting in a new parallel drive, installing new water fountains and installing new HVAC controls and new roof-top HVAC units. All that remains is landscaping and replacing a switchgear. The switchgear will replaced over the winter break.


Project Scope

Bond-funded work at Ditto is being done in two stages. The first stage includes adding two STEM labs, an art room and a strings room. The second stage includes a number of life-cycle and deficiency upgrades.

  • Add two STEM labs
  • Add a strings classroom
  • Upgrade technology connectivity
  • Improve existing site accessibility
  • Add additional card access controls
  • Repair roof
  • Replace and add parking
  • Repair/replace and upgrade heating and A/C, electrical, electrical equipment, plumbing, exterior, landscaping and site lighting
  • Upgrade security cameras and PA system (to be done by AISD security and technology departments)

This report includes highlights of projects. The list is not comprehensive and is subject to modification.