Project Status

UPDATE: The Bond 2019 project at Hale Elementary is in phase two of the five-year bond program. Construction started in June.

Inside highlights included repainting metal doors, replacing the gym floor, refinishing the custodial closets, replacing the flooring in the teacher’s lounge, replacing the ceiling in the kitchen, and installing a new HVAC controls system.

Outside, project highlights included replacing fallen concrete sidewalks and patio, installing a swale at the front for better drainage, regrading and sodding around the building and replacing the marquee with a new digital one.

Most work is now complete and it all should wrap up by March.

New playgrounds for Hale were in phase three and are now open.

Project Scope

  • Heating & A/C and Electrical Improvements
  • Interior Renovations (Flooring, etc.)
  • ADA Accessibility Improvements (Door hardware, ramps, restrooms, etc.)
  • Site Improvements (Lighting, landscaping, drainage, irrigation, signage, etc.)
  • Paving Improvements

This list is not comprehensive and is subject to change.

  • Full-day Pre-K Renovations Specific to Campus Needs
  • Playground Replacements and Renovations (Surface, equipment, canopy, ADA accessible)
  • Instruments
  • Gym Floor Replacements

This list is not comprehensive and is subject to change.

  • Expanded Security Camera Coverage and Upgraded Camera Software
  • Safety & Security Enhancements (Exterior and interior key system upgrades, district communication system upgrades, lighting, fencing, etc.)
  • Device Upgrades and Expanded Access

This list is not comprehensive and is subject to change.

Project Details

PHASE
Phase 2

CONSTRUCTION
Start: Summer 2023      Finish: Summer 2024

ARCHITECT
JR2 Architects

CONSTRUCTION MANAGER
Falkenberg Construction

PHASE
Phase 3

CONSTRUCTION
Start: Fall 2023     Finish: Fall 2023

ENGINEER 
Glenn Engineering

CONSTRUCTION
J Squared (concrete/earthwork)
Lea Park & Play (playground equipment and install)

Contact Us

Bond 2019 logo
AISD Bond 2019 logo

Bond 2019

$966 MILLION

• Facilities
• Fine Arts
• Safety, Security & Technology
• Transportation

Fine Arts icon
Fine Arts icon

Fine Arts

The fine arts portion includes: theater equipment and black boxes, instruments, visual arts equipment and work surfaces, piano replacements and uniforms for marching bands, drill teams and choirs.

Icon for safety, security and technology
Icon for the Bond 2019's Safety, Security & Technology

Safety, Security & Tech

The safety, security and technology portion includes: additional security cameras and upgraded alarm systems, districtwide communications system upgrade, network infrastructure, device replacements and strategic 1:1 (student devices).

Transportation icon
Transportation icon

Transportation

The transportation portion of the bond includes new buses, shuttle buses, service vehicles. Also included are new vehicles and trailers for the Dan Dipert Career + Technical Center, the Agricultural Science Center, high school bands and security.

Facilities icon
Facilities icon

Facilities

The facilities portion includes: new construction, condition needs and life cycle improvements for all schools, new playgrounds at all elementary schools and facility upgrades for fine arts and athletics.